USER INSTRUCTION MANUAL

Build Me A Warehouse

Back to app

YOUR WAREHOUSE. YOUR RULES.

Build with confidence.

Learn the controls, plan your spending and turn a good layout into a winning business.

01 / USER GUIDE

Start here

Build a business. Solve the logistics. Stay within your budget.

Build Me A Warehouse is a creative 3D planning game. Choose a business and its products, arrange equipment, stock the shelves, and complete contracts. Every warehouse has the same 50,000-square-foot floor: 250 by 200 feet.

  1. Open the app and choose your warehouse type, product focus and dollar budget.
  2. Choose a stocked starter layout to learn the controls, or an empty warehouse to build from scratch.
  3. Choose components, review each price popup and place them on the floor.
  4. Check the Challenges tab, fix layout problems and keep spending below the budget limit.
  5. Choose Finish & tour. A win requires every selected contract goal and a build within budget.

02 / USER GUIDE

Choose your warehouse and budget

The first choices define the business you are trying to build.

Business and products

Choose from 24 warehouse types, including janitorial supplies, beverages, small parts, grocery, automotive, electronics, furniture, apparel and building materials. Product focus offers a mixed assortment or eight specific product choices for that business.

A stocked starter layout gives you a working example. Start empty gives you the same 50,000 sq ft floor without equipment. One project is saved separately for each industry on this browser and device.

Choose a dollar budget

Budget rangeMaximum spending
Lean: $75,000-$150,000$150,000
Balanced: $150,000-$250,000$250,000
High-tech: $250,000-$450,000$450,000
Flagship: $450,000-$750,000$750,000

The upper end of the selected range is your spending limit. Spending less than the lower end is allowed. For a first attempt, Balanced provides more room to learn than Lean.

Read the price popup before adding

Each component selection shows its price, your current build total, the total after adding it, and the money remaining. Choose Add to build, then tap the floor to place the piece. Cancel closes the popup without placing it.

Prices are shown in US dollars for gameplay. They are illustrative equipment prices, not supplier quotations or actual charges.

03 / USER GUIDE

Add, arrange and customize components

Build the interior one piece at a time.

Component groupWhat you can add
BuildingColumns, steel beams, docks, doors, partitions, glazing, lights, mezzanines and stairs.
StoragePallet racking, parts shelving, cantilever racks, chilled rooms, secure cages and tanks.
ProductsIndustry stock, pallets, cases, bottles, drums, totes, tires, materials and other goods.
HandlingForklifts, reach trucks, order pickers, pallet jacks, stretch wrappers, scrubbers and dock levelers.
AutomationConveyors, transfer tables, sorters, robots, packing arms and charging bays.
WorkplaceDesks, chairs, lockers, benches, terminals and staff facilities.
SafetyBarriers, bollards, fire equipment, first aid, eyewash, spill cabinets and waste equipment.

Place a component

  1. Open Components. Choose a group or use Search.
  2. Select a piece and review the dollar-price popup. Choose Add to build.
  3. Tap an open area inside the floor. The piece is placed and its cost enters your build total.
  4. Use Cancel in the placement banner if you change your mind before placing it.

Edit a placed component

Choose Select / move, then tap a component. Drag to move it, or open Selected piece on a phone. Set its label, X and Z position, width, depth, height and finish color. Storage pieces may also offer shelf levels and Fill with industry products. Choose Apply changes.

Rotate 90 degrees changes orientation. Duplicate creates another piece and shows its price popup. Remove deletes the selected piece and reduces the build total. Undo and Redo retain up to 50 design steps.

04 / USER GUIDE

Move around the 3D warehouse

Use the best view for the task in front of you.

ControlWhat it does
Select / moveTap a piece to select it; drag to move it. Drag empty space to orbit.
OrbitDrag to rotate the viewing angle without moving equipment.
PanDrag to move the camera target across the floor.
Floor plan / 3D viewSwitch between an overhead planning view and perspective 3D.
FitRestore the default camera position and zoom.
Minus / PlusZoom out or in. Two fingers also pinch to zoom; mouse wheel zooms.
Floor gridShow or hide the floor-grid overlay.
Goods routeShow the connected receiving-to-packing path, if one exists.
Labels / Roof beamsToggle component labels and extra overhead roof beams.

Phone and tablet

Use the tabs below the view: Components, Selected piece and Challenges. Select / move is for placement; Orbit is for looking around. Dragging snaps positions to one-foot increments. Numeric fields allow finer positioning.

Keyboard shortcuts

KeyAction
Arrow keysMove the selected piece by 1 ft in the floor X/Z directions.
Shift + arrowMove the selected piece by 5 ft.
RRotate the selected piece by 90 degrees.
Delete / BackspaceRemove the selected piece.
Ctrl or Command + ZUndo; add Shift to redo.
EscapeCancel placement and selection; during a demo, exit the demo.

05 / USER GUIDE

Win contracts by thinking like an operator

A good-looking build also has to meet the selected goals.

Open Challenges and choose a design scenario. Contract board lets you select a contract and see saved wins. There are four contracts per industry. Choose Finish & tour to claim a win after all goals are met.

ContractThe design problem
Balanced distributionMeet storage and packing targets, keep a connected route, avoid overlaps, fit below the ceiling, provide basic safety equipment and stay within budget.
The picking-route challengeMeet the basic goals and keep the receiving-to-packing route at 25 ft or less.
Automation on a budgetMeet the basic goals; provide two robots, two charging bays, a conveyor and a connected route.
The peak-season rushProvide 25% more storage and 50% more packing capacity without raising the selected budget.

Use the live feedback

  • Storage positions measure modelled capacity, not the number of individual products.
  • Orders / hour is the sum of simplified packing-station capacity.
  • Spending and the dollar-balance bar show whether the build fits your chosen budget.
  • A red outline identifies overlapping floor equipment. Fix those pairs before trying to win.
  • A ceiling goal identifies pieces taller than the building. Increase ceiling height or reduce equipment height.

Test movement space

Select a 4, 6, 8 or 10 ft aisle-clearance model. Goods route uses a two-foot floor grid and the first loading dock and first packing station. Wider clearance can block a route that worked at a smaller setting.

06 / USER GUIDE

Stock the shelves and run the operation

Turn an empty layout into a distribution business.

Choose what you sell

Product focus changes the stock appearance for the selected business. The Products group offers that industry's individual product pieces. Select and place those goods just like any other component; their price popup appears first.

Fill storage

  1. Select a storage piece and open Selected piece.
  2. Check Fill with industry products, then choose Apply changes.
  3. Or open Challenges and choose Stock all storage to fill all eligible storage pieces.
  4. Choose View inventory to inspect designed capacity and whether each stock location is filled.

Run the operation

Choose Run operation. Conveyor cartons and mobile robots animate along the connected goods route. The route is a conceptual flow demonstration, not an autonomous navigation controller. Choose Pause operation before editing equipment.

Know what the model assumes

FeatureGame assumption
Pallet racking3 storage positions per shelf level.
Parts shelving6 bins per shelf level.
Chilled room / secure cage24 / 12 storage positions in this model.
Packing bench35 modelled orders per hour.
Robotic packing arm55 modelled orders per hour.
ConveyorsDemonstrate movement; do not add packing capacity by themselves.
ResizingDoes not automatically change price or storage-position count.

07 / USER GUIDE

Watch the demo and show your finished build

See the complete process, then make the workshop your own.

Auto Play Demo

Choose Auto Play Demo in the header or Watch the complete Auto Play Demo on the start screen. It uses your selected warehouse type and product focus. The demonstration uses a $150,000-$250,000 budget and does not change your own project, budget or saved wins.

Twenty narrated steps take the scene from an empty floor through steelwork, docks, racking, products, handling equipment, automation and safety. The demo shows an overlap and an over-budget choice, fixes them, solves a peak-season challenge and finishes with a winning warehouse.

Demo controlWhat it does
Pause / ResumeStop or continue the automatic presentation.
Speed: 1x / 2x / 4xChange how quickly the presentation advances between steps.
Next stepSkip to the next stage; you can use it while paused.
ReplayWatch from the beginning after the demonstration is complete.
Exit demo / EscapeReturn to your original project and view.

Normal playback takes about 2 minutes 32 seconds. Moving away from the app pauses presentation timing. At the end you can resume or pause the tour, replay, or exit.

Finish & tour

Choose Finish & tour to see your result, total spending, remaining budget and unresolved goals. A valid result records a contract win. Explore the finished warehouse starts an orbiting 3D tour. Return to editing takes you back to the builder.

Save warehouse image downloads a PNG of the current warehouse view. Print floor plan opens the browser's print dialog with an overhead view; choose a printer or Save as PDF where available.

08 / USER GUIDE

Save, back up and solve common problems

Protect your work before changing browsers or devices.

How saving works

Design changes save automatically on this browser and device. Save writes the current project immediately. Each industry has one separate saved project, including its budget, product focus, active contract, aisle-clearance setting and completed contracts.

  1. Choose Backup to download a project JSON file. Save a copy somewhere you can find it.
  2. To use that project in another browser or on another device, open the app there and choose Restore.
  3. Select the JSON file and confirm replacement. The app validates the file before loading it.
  4. Use Undo if you want to reverse a restore. Back up different versions if you want more than one design for an industry.

Add to home screen

On iPhone or iPad, open the app in Safari, choose Share, then Add to Home Screen. On Android, use Chrome's menu and Install app or Add to Home screen. On desktop, use the browser's install option if offered, or bookmark the app.

ProblemWhat to try
I cannot move a piece.Pause the operation, choose Select / move, and tap the piece. Use Selected piece fields for precise movement.
No goods route appears.Add a loading dock and a packing station or arm. Move obstacles away from their access areas, then try the clearance settings.
The score says OVER.Remove expensive pieces or choose a larger budget. Resolve the spending problem before claiming a win.
My project is missing.Use the same browser and device, or restore a backup. Clearing website data removes local projects.
A backup will not restore.Use an app-generated JSON project, not an image or PDF. The file must use supported dimensions, components and settings.
The app will not open offline.Open it online first and allow the core files to load. Offline availability depends on browser storage and successful caching.

User manual · October 2026 · easyapps123

Your final build invoice

Finish the game to see the detailed invoice automatically. Every installed component is grouped by category with its quantity, unit price and line total, followed by category subtotals, final expenditure, budget limit and remaining money (or the amount over budget). Use Print / Save PDF to print all invoice pages or Download CSV to keep the itemized costs.

The complete Auto Play Demo ends on its final invoice. Close it to explore the finished build; use Detailed invoice to open it again. The last view in the screenshot gallery is the sample invoice, which scrolls to show every line. Your own saved project remains unchanged by the demo.